電氣成套設(shè)備越級(jí)跳閘的主要情況如何?

發(fā)布時(shí)間:2022-04-25 來(lái)源:http://www.dzktjn.com/ 瀏覽量:

  電氣成套設(shè)備的使用避免不了問(wèn)題的出現(xiàn),提前做好預(yù)防工作有利于減少問(wèn)題的出現(xiàn),我們需要知道有哪些故障問(wèn)題會(huì)出現(xiàn),比如電氣成套設(shè)備越級(jí)跳閘的主要情況如何?
  The use of electrical complete equipment can not avoid the emergence of problems, do a good job of prevention in advance to reduce the emergence of problems, we need to know what fault problems will appear, such as the main situation of electrical complete equipment trip?
  主開(kāi)關(guān)負(fù)載容量小于分開(kāi)關(guān)負(fù)載總和的容量;主開(kāi)關(guān)有漏電保護(hù)裝置然而分開(kāi)關(guān)沒(méi)有,當(dāng)用電器漏電大于等于30毫安時(shí)主開(kāi)關(guān)跳閘;兩級(jí)電氣成套設(shè)備保護(hù)不匹配,盡量使用同的電氣成套設(shè)備;經(jīng)常帶負(fù)荷操作主開(kāi)關(guān)導(dǎo)致觸電碳化接觸不良后電阻增大電流升高發(fā)熱跳閘;下級(jí)電氣成套設(shè)備配置的保護(hù)無(wú)法正確判斷故障;電氣成套設(shè)備老化導(dǎo)致分勵(lì)脫扣時(shí)間變長(zhǎng),要更換一個(gè)分勵(lì)脫扣時(shí)間小于上一級(jí)開(kāi)關(guān)的分開(kāi)關(guān)。
  The load capacity of the main switch is less than the total load capacity of the separate switches. The main switch has leakage protection device but not separated off, when the use of electrical leakage is greater than or equal to 30 ma when the main switch trip; Two levels of complete electrical equipment protection does not match, try to use the same brand of complete electrical equipment; Often with load operation of the main switch lead to electric carbonization contact poor resistance increases current increases heat trip; Failure can not be correctly judged by the protection of subordinate complete electrical equipment configuration; The aging of the complete electrical equipment causes the shunt trip time to be longer. Replace a shunt trip whose time is shorter than the split switch of the previous level.
  如發(fā)生上級(jí)電氣成套設(shè)備越級(jí)跳閘,若查明有分路保護(hù)動(dòng)作,但該分路電氣成套設(shè)備未跳閘,則分?jǐn)嘣摷?jí)電氣成套設(shè)備,然后恢復(fù)上級(jí)電氣成套設(shè)備;若查明各分路保護(hù)均未動(dòng)作,則應(yīng)檢查停電范圍內(nèi)設(shè)備有無(wú)故障,若無(wú)故障可合上上級(jí)電氣成套設(shè)備,并逐一試送各分路電氣成套設(shè)備。當(dāng)送到某一分路時(shí)電源電氣成套設(shè)備又再跳閘,則可判明該電氣成套設(shè)備為故障電氣成套設(shè)備,可對(duì)該線路進(jìn)行隔離維修更換。
  In case of grade-exceeding trip of superior complete electrical equipment, if it is found that there is shunt protection action, but the shunt complete electrical equipment does not trip, the electrical complete set of the same level shall be cut off, and then the superior complete electrical equipment shall be restored; If it is found that none of the shunt protection works, it should be checked that there is no fault within the scope of power failure. If there is no fault, the superior electrical complete set of equipment can be closed and each shunt complete set of electrical equipment can be tried one by one. When the power electrical complete set of equipment is sent to a branch and then trips again, it can be determined that the electrical complete set of equipment is faulty electrical complete set of equipment, and the line can be isolated, repaired and replaced.
  電氣成套設(shè)備要跳閘須符合兩個(gè)條件,一是故障電流大小達(dá)到設(shè)定值,二是故障電流持續(xù)時(shí)間達(dá)到設(shè)定的時(shí)間長(zhǎng)度,所以要確保電氣成套設(shè)備不越級(jí)跳閘須在電流設(shè)定值和時(shí)間設(shè)定值上配合好。要確保不越級(jí)跳閘須用繼保設(shè)備測(cè)試電氣成套設(shè)備的實(shí)際動(dòng)作時(shí)間總長(zhǎng),用實(shí)際試驗(yàn)結(jié)果的時(shí)間長(zhǎng)度來(lái)確保配合的正確。
  Tripping of complete electrical equipment must meet two conditions, one is the fault current reaches the set value, the other is the fault current duration reaches the set time length, so to ensure that the complete electrical equipment does not skip the trip, it must cooperate well in the current set value and time set value. To ensure that there is no leap-step trip, it is necessary to test the total actual operation time of complete electrical equipment with follow-up equipment, and ensure the correct coordination with the time length of actual test results.
  電氣成套設(shè)備越級(jí)跳閘的主要情況如何?以上便是問(wèn)題的相關(guān)解答了,如果您對(duì)此有疑問(wèn)的話可以通過(guò)網(wǎng)站www.dzktjn.com聯(lián)系到我們,人員在線為您解惑!
  What is the main situation of grade-jumping trip of complete electrical equipment? The above is the relevant answer to the question, if you have any questions about this, you can contact us through the website www.dzktjn.com, professional online for you to solve the doubts!
首頁(yè)首頁(yè) 產(chǎn)品產(chǎn)品 電話電話 置頂置頂
亚洲精品第1页| 肌肌对肌肌免费视频大全| 李采潭可疑的美容院| 亚洲最大在线| 97久久精品国产| 中出し女教师の诱惑里美| 久久人人97超碰人人澡爱香蕉| 在线看日韩毛片| 男男抹布np多人蹂躏| 福临之都市后宫| 欧美人与性动交a欧美精品| 东北狗儿娘的原著小说| 军人野外边走边吃她花蒂| 亚洲精品少妇| 被污辱被禁锢强制的爱h| 动画片艳母| 《韩国r级精彩合集3小时| 狠狠躁日日躁夜夜躁2022麻豆| 久久久欧洲| 罚男仆夹震蛋器憋尿虐乳双性小说| 丈母娘的秘密| 亚洲少妇综合网| 51ⅴ精品国产91久久久久久| 亚洲综合在线一区二区| 免费嗨片直播网中文字幕| 奶水都喷出来了np| 亚洲精品suv| 久久久噜噜噜久久久小说| 大bbw大bbw巨大bbw看看| 调教抽搐高潮颤抖失禁| 欧美午夜精品久久久久| 国产又粗又长又猛又爽又黄的视频| 女人与黑人做爰啪啪| 欧美色999| 黄色网止| 无人在线观看完整免费版视频| 婷婷综合五月天| 麻豆free hd xxxx chinese| 日韩不卡一区二区| 亚洲欧洲美洲精品一区二区三区| 催眠警察高h荡肉呻吟男男|